Projects in practice

Every installation requires a different approach. What works in one situation does not automatically fit another. That is why we evaluate the process, consumption, and specific requirements for each individual project.

These projects demonstrate how installations are applied in practice, from new constructions to modifications in existing situations. The focus is always on an installation that continues to operate with the necessary efficiency and reliability.

Below is a selection of projects, categorized by sector.

Horticulture

In greenhouse horticulture, everything revolves around continuity and control. Installations must align precisely with the crop and energy consumption.

Utilities

In the utility sector, the focus is on operational reliability and efficient energy use. This includes buildings where installations must perform reliably day in and day out.

Industry

In industry, processes are leading. Installations must meet production requirements and often function under more demanding conditions.

Zantingh premises

Project overview

View projects by sector and filter for what is relevant. This quickly clarifies which installations have been applied and how they operate in practice.

Sector filter

Unigas Novumax combination in collaboration with HoSt Bioenergy

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.

RKB burner PanAmerican Seed Hem

Ateco worked on a new boiler house with a heating installation and Zantingh RKB compact burner for PanAmerican Seed in Hem.

Cryonorm Vaporizer

The test setup for a new gas vaporizer went into operation at Cryonorm, featuring a specially designed RKB 5.0 from Zantingh.

Pre-assembled burner installation U.S.A.

Zantingh designed three burner installations that were completely assembled, tested, and prepared for transport in the workshop.

Bine Agro, Baku, Azerbaijan

At Bine Agro near Baku, six 4 MW burners are operating for 65 hectares of cultivation. The first burners were commissioned in March 2018.

Eneco District Heating Plant

Four Low NOx natural gas burners were supplied for existing boilers at Eneco in Utrecht. NOx emissions decreased by nearly a third.

Statoil refinery Kalundborg, Denmark

At Statoil in Kalundborg, two flue gas condensers were installed to provide extra efficiency for a new steam installation.

Tergooi hospital Hilversum, replacement of burner installation 70 mg

In 2016, Tergooi replaced two burner installations to comply with the emission requirement of 70 mg/m³ at 3% O₂.

Party with Duyvis Zaandam

In 2016, Duyvis replaced the existing burner installation to comply with the emission requirement of 70 mg/m³ at 3% O₂.

New construction for bell pepper grower Tas Luttelgeest

Tas Paprika is expanding the Luttelgeest location to 25 hectares and is also choosing a gas burner with reliable service there.

District heating plant Frederikshavn Varmeværk, Denmark

Two 15 MW RKB 12 HO Low NOx burners were supplied for Frederikshavn Varme, delivered as a complete system and installed by NISSEN.

Do you have a technical question or would you like to discuss your project?