Borst Tulips installation in connection with the Green Label Greenhouse subsidy scheme

For Borst Tulips in Heerhugowaard, a NOx emission of <50 mg was required to comply with the Green Label Greenhouse scheme. A new heating installation was installed for this purpose in 2021.

The installation consists of a BBK 1.00 single-pass boiler with a Zantingh gas burner TR 1.0, equipped with Siemens control and Climatix Cloud service. With a measured NOx emission of 34.1 mg/m³, the installation remains well below the set requirement.

Project details

Completion: 2023
Company details: Borst Tulips
Crop: Tulips
Burner type: 1x TR 1.0 ND MM Gas
Boiler capacity: 1,000 Mcal / 1,163 kW
Gas consumption full load: 140 nm3/h

View our
other projects

Unigas Novumax combination in collaboration with HoSt Bioenergy

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.

RKB burner PanAmerican Seed Hem

Ateco worked on a new boiler house with a heating installation and Zantingh RKB compact burner for PanAmerican Seed in Hem.

Cryonorm Vaporizer

The test setup for a new gas vaporizer went into operation at Cryonorm, featuring a specially designed RKB 5.0 from Zantingh.

Pre-assembled burner installation U.S.A.

Zantingh designed three burner installations that were completely assembled, tested, and prepared for transport in the workshop.

Bine Agro, Baku, Azerbaijan

At Bine Agro near Baku, six 4 MW burners are operating for 65 hectares of cultivation. The first burners were commissioned in March 2018.