Project

Unigas Novumax combination in collaboration with HoSt Bioenergy

In collaboration with HoSt Bioenergy, a new Unigas Novumax combination was realized for Milagros in Spain. The installation was completed in 2026.

The installation consists of a Novumax H2R1050 boiler with two Unigas E165A gas burners. With a boiler output of 1,036 kW and a gas consumption of 100 Nm³/h at full load, the combination forms an efficient solution for the company’s heat supply.

Project details

Completion: 2026
Company details: Milagros Spain
Burner type: 2x E165A.MB.PR.SR.NL.Y.1.40/65.EC.FGR
Boiler capacity: 1036 kW
Gas consumption full load: 100 nm3/h
Boiler type: Novumax H2R1050

View our
other projects

TR-Burner Mirial Tulips

Project Mirial Tulips with the new Siemens LMV 6 burner management system.

Bros. Boon

Zantingh is supplying a complete Novum/Unigas combination for Bros. Boon in Hem. The installation consists of a Novumax H2R 1250 heating boiler in combination with a Zantingh-Unigas E150X gas burner.

New Unigas gas burner for Houben Hydrangea

For Houben Hydrangea in Venlo, we are handling the conversion of the existing burner installation. The installation is being equipped with a new Zantingh-Unigas gas burner with a boiler capacity of 525 kW.

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.

RKB burner PanAmerican Seed Hem

Ateco worked on a new boiler house with a heating installation and Zantingh RKB compact burner for PanAmerican Seed in Hem.