Project

Electric boilers at Van Gog Kwekerijen

Electric heating is playing an increasingly important role in greenhouse horticulture. Van Gog Kwekerijen anticipated this early on. A total of four electric boilers have been installed across two locations. These boilers fill the buffer tanks with hot water at times when electricity prices are low. This ensures energy is utilized when it is available and cost-effective.

The system was designed, built, and connected by Cogas Climate Control.

Project details

Completion: 2023
Company details: Van Gog Farming / Van Gog Kwekerijen
Boiler capacity: 4x 1,200 kW
Boiler type: 4x SB 41200

View our
other projects

Unigas Novumax combination in collaboration with HoSt Bioenergy

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

RKB burner PanAmerican Seed Hem

Ateco worked on a new boiler house with a heating installation and Zantingh RKB compact burner for PanAmerican Seed in Hem.

Cryonorm Vaporizer

The test setup for a new gas vaporizer went into operation at Cryonorm, featuring a specially designed RKB 5.0 from Zantingh.

Pre-assembled burner installation U.S.A.

Zantingh designed three burner installations that were completely assembled, tested, and prepared for transport in the workshop.

Bine Agro, Baku, Azerbaijan

At Bine Agro near Baku, six 4 MW burners are operating for 65 hectares of cultivation. The first burners were commissioned in March 2018.

Would you also like more control over energy consumption and costs? Discover the possibilities for your installation.

Contact us