Project

PanAmerican Seed Hem

PanAmerican Seed in Hem

PanAmerican Seed is a leading international producer of annuals, perennials, potted plants, cut flowers, vegetables, and herbs from seed.

New boiler house with heating installation

In 2022, Ateco worked hard on a new boiler house with a heating installation for the European location in Hem. The installation consists of a Boeters BBK 2.50 equipped with a Zantingh RKB compact burner, featuring a Siemens control system and Climatix Cloud service.

Project details

Completion: 2022
Company details: PanAmerican Seed
Crop: Floriculture
Burner type: 1x RKB 2.5 ND MM Gas
Boiler capacity: 2,500 Mcal / 2,908 kW
Gas consumption full load: 358 nm³/h

View our
other projects

Unigas Novumax combination in collaboration with HoSt Bioenergy

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.

Cryonorm Vaporizer

The test setup for a new gas vaporizer went into operation at Cryonorm, featuring a specially designed RKB 5.0 from Zantingh.

Pre-assembled burner installation U.S.A.

Zantingh designed three burner installations that were completely assembled, tested, and prepared for transport in the workshop.

Bine Agro, Baku, Azerbaijan

At Bine Agro near Baku, six 4 MW burners are operating for 65 hectares of cultivation. The first burners were commissioned in March 2018.