Pre-assembled burner installation U.S.A.

Prefabricated, assembled and tested

The Zantingh project department recently designed three prefab installations for a client. The installations were completely assembled and tested in the workshop. For transport, they only need to be partially disassembled afterwards.

Quick connection on site

The burner panel and the gas train are built together on a single frame. Due to the foldable construction, the installation fits into an export crate. On site, only the gas line and the cabling from the panel to the burner need to be connected.

Customers are increasingly requesting burner installations that are pre-assembled as completely as possible. This helps with projects abroad, especially when technical personnel or knowledge is limited. Cabling in particular often proves difficult in the field.

Project details

Completion: 2022
Company details: United States
Special features: control cabinet and gas train pre-assembled on frame and electrically connected
Burner type: 3x RKB 6.0 ND MM G/O
Gas consumption full load: 2,184 nm3/h

View our
other projects

Unigas Novumax combination in collaboration with HoSt Bioenergy

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.

RKB burner PanAmerican Seed Hem

Ateco worked on a new boiler house with a heating installation and Zantingh RKB compact burner for PanAmerican Seed in Hem.

Cryonorm Vaporizer

The test setup for a new gas vaporizer went into operation at Cryonorm, featuring a specially designed RKB 5.0 from Zantingh.

Bine Agro, Baku, Azerbaijan

At Bine Agro near Baku, six 4 MW burners are operating for 65 hectares of cultivation. The first burners were commissioned in March 2018.