TR-Burner Mirial Tulips

For the Mirial Tullips new construction, Zantingh supplied a new TR burner on a Novumax boiler. This burner is equipped with the new Siemens LMV 6.

The LMV 6 is the brand-new burner management system from Siemens. For medium and high-capacity burners. Powerful, scalable, and ready for the next step.

Project details

Completion: 2026
Company details: Mirial Tullips
Crop: Tulips
Burner type: 1x TR 2.0 ND MM Gas
Boiler capacity: 2,376 kW
Gas consumption full load: 288 nm3/h
Boiler type: Novumax LN2500

View our
other projects

Unigas Novumax combination in collaboration with HoSt Bioenergy

A Unigas Novumax combination was realized in collaboration with HoSt Bioenergy.

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.

RKB burner PanAmerican Seed Hem

Ateco worked on a new boiler house with a heating installation and Zantingh RKB compact burner for PanAmerican Seed in Hem.

Cryonorm Vaporizer

The test setup for a new gas vaporizer went into operation at Cryonorm, featuring a specially designed RKB 5.0 from Zantingh.

Pre-assembled burner installation U.S.A.

Zantingh designed three burner installations that were completely assembled, tested, and prepared for transport in the workshop.