Project

Statoil refinery Kalundborg, Denmark

*]:pointer-events-auto R6Vx5W_threadScrollVars scroll-mb-[calc(var(–scroll-root-safe-area-inset-bottom,0px)+var(–thread-response-height))] scroll-mt-[calc(var(–header-height)+min(200px,max(70px,20svh)))]” dir=”auto” data-turn-id=”request-WEB:d0d6f969-9a5e-425a-9f7b-7e15845e36ca-13″ data-turn-id-container=”request-WEB:d0d6f969-9a5e-425a-9f7b-7e15845e36ca-13″ data-testid=”conversation-turn-18″ data-scroll-anchor=”false” data-turn=”assistant”>

New steam installation in Kalundborg

The Statoil Refining Denmark A/S oil refinery is located in Kalundborg, Denmark. The plant uses steam at 250 ºC to process crude oil into HEMI oil. The same steam heats the transport pipelines to prevent the oil from cooling down too much.

Extra efficiency from flue gases

The steam installation was due for renewal. In 2017, a new installation was commissioned, featuring two flue gas condensers for a boiler capacity of nearly 12 MW each.

The flue gas condensers extract residual heat from the flue gases. This is used to preheat cold water before it enters the boiler, resulting in extra efficiency. The project was carried out in collaboration with the Danish installer Jan Hansen from V. Hansen Ap.

Project details

Completion: 2017
Company details: Statoil, Kalundborg, Denmark
Special features: 2x ZRC 10.0H.SLF.P6
Application: Oil refining
Boiler capacity: 11,630 kW

View our
other projects

TR-Burner Mirial Tulips

Project Mirial Tulips with the new Siemens LMV 6 burner management system.

Bros. Boon

Zantingh is supplying a complete Novum/Unigas combination for Bros. Boon in Hem. The installation consists of a Novumax H2R 1250 heating boiler in combination with a Zantingh-Unigas E150X gas burner.

New Unigas gas burner for Houben Hydrangea

For Houben Hydrangea in Venlo, we are handling the conversion of the existing burner installation. The installation is being equipped with a new Zantingh-Unigas gas burner with a boiler capacity of 525 kW.

Unigas Novumax combination in collaboration with HoSt Bioenergy

A Unigas Novumax combination was realized in collaboration with HoSt Bioenergy.

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.