Project

Tergooi hospital Hilversum, replacement of burner installation 70 mg

New burner installations for Tergooi

Tergooi is a hospital where the patients’ quality of life is central. A green, hospitable environment where patients and their loved ones feel welcome, and where employees work daily on thoughtful care.

Environmentally conscious operations also play an important role. That is why Tergooi once again chose two new burner installations in 2016.

Compliance with emission requirements

The existing burner installations had to be replaced due to the emission requirement applicable from January 1, 2017: 70 mg/m³ at 3% O₂. Due to the new Activities Decree, existing installations must also comply with this requirement.

On this page, you can see photos of the situation before and after the replacement. A short video has also been added to provide a better view of the new burner installations.

Project details

Completion: 2016
Company details: Tergooi Hospital, Hilversum
Burner type: 2 x TR 1.5 ND LMV Gas / oil
Boiler capacity: 2.5 tons of steam/hour based on 1,772 kW load
Gas consumption full load: 200 nm3/h

View our
other projects

Unigas Novumax combination in collaboration with HoSt Bioenergy

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.

RKB burner PanAmerican Seed Hem

Ateco worked on a new boiler house with a heating installation and Zantingh RKB compact burner for PanAmerican Seed in Hem.

Cryonorm Vaporizer

The test setup for a new gas vaporizer went into operation at Cryonorm, featuring a specially designed RKB 5.0 from Zantingh.

Pre-assembled burner installation U.S.A.

Zantingh designed three burner installations that were completely assembled, tested, and prepared for transport in the workshop.