Eneco District Heating Plant

*]:pointer-events-auto R6Vx5W_threadScrollVars scroll-mb-[calc(var(–scroll-root-safe-area-inset-bottom,0px)+var(–thread-response-height))] scroll-mt-[calc(var(–header-height)+min(200px,max(70px,20svh)))]” dir=”auto” data-turn-id=”request-WEB:d0d6f969-9a5e-425a-9f7b-7e15845e36ca-12″ data-turn-id-container=”request-WEB:d0d6f969-9a5e-425a-9f7b-7e15845e36ca-12″ data-testid=”conversation-turn-16″ data-scroll-anchor=”false” data-turn=”assistant”>

Low NOx burners for existing boilers

In collaboration with Eneco heat production Utrecht, we supplied four Low NOx natural gas burners for the auxiliary heating plant on Nicolaas Beetsstraat, near the city center of Utrecht.

Eneco aims to realize “Sustainable energy for everyone.” This means not only making the energy transition possible but also accelerating it. This is achieved, among other things, by designing and implementing smart energy systems together with suppliers.

Lower emissions without new boilers

Completely replacing an existing boiler is not always attractive. Many natural gas-fired boilers are still in good technical condition but do not meet the NOx requirement of less than 70 mg/nm³ at 3% O₂.

The principle in our gas burner head creates a stable, relatively cold flame. This limits NOx emissions. A portion of the flue gases is internally recirculated, allowing the installation to operate with a lower air excess than systems with external flue gas recirculation.

No carbon monoxide is produced, and therefore no soot. This results in higher efficiency and prevents fouling. Because the system could be applied to the existing boilers, no investment in new boilers was necessary. NOx emissions have been reduced by nearly a third.

Project details

Completion: 2017
Company details: Eneco, District Heating Plant
Special features: < 70 mg / nm3 at 3% O2.
Burner type: 4x RKB 14.0 ND MM Gas
Boiler capacity: 4x Bronswerk 14,500 k
Gas consumption full load: 1,877 nm3/h

View our
other projects

TR-Burner Mirial Tulips

Project Mirial Tulips with the new Siemens LMV 6 burner management system.

Bros. Boon

Zantingh is supplying a complete Novum/Unigas combination for Bros. Boon in Hem. The installation consists of a Novumax H2R 1250 heating boiler in combination with a Zantingh-Unigas E150X gas burner.

New Unigas gas burner for Houben Hydrangea

For Houben Hydrangea in Venlo, we are handling the conversion of the existing burner installation. The installation is being equipped with a new Zantingh-Unigas gas burner with a boiler capacity of 525 kW.

Unigas Novumax combination in collaboration with HoSt Bioenergy

A Unigas Novumax combination was realized in collaboration with HoSt Bioenergy.

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.