Project

District heating plant Frederikshavn Varmeværk, Denmark

Low NOx burners for Frederikshavn Varme

In collaboration with Tjæreborg Industri, we supplied two 15 MW RKB 12 HO Low NOx burners for the Frederikshavn Varme district heating plant on Niels Juelsvej.

One burner is equipped with an economizer. The other burner features an Optinox system. Both burners are fitted with a Siemens LMW combustion controller.

Fully supplied and installed

The burners were supplied as a complete system, including site, safety, and quality inspections. Our partner NISSEN energi teknik a/s handled the delivery and installation.

Project details

Completion: 2012
Company details: Frederikshavn Varmevaerk, Denmark
Burner type: 2x RKB 12.0 ND LMV Gas
Boiler capacity: 12,900 Mcal/ 15,000 kW
Gas consumption full load: 1,482 nm3/h
Boiler type: 4x SB 41200

View our
other projects

TR-Burner Mirial Tulips

Project Mirial Tulips with the new Siemens LMV 6 burner management system.

Bros. Boon

Zantingh is supplying a complete Novum/Unigas combination for Bros. Boon in Hem. The installation consists of a Novumax H2R 1250 heating boiler in combination with a Zantingh-Unigas E150X gas burner.

New Unigas gas burner for Houben Hydrangea

For Houben Hydrangea in Venlo, we are handling the conversion of the existing burner installation. The installation is being equipped with a new Zantingh-Unigas gas burner with a boiler capacity of 525 kW.

Unigas Novumax combination in collaboration with HoSt Bioenergy

A Unigas Novumax combination was realized in collaboration with HoSt Bioenergy.

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.