Unigas Novumax combination in collaboration with HoSt Bioenergy
Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.
Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.
RKB burner PanAmerican Seed Hem

Ateco worked on a new boiler house with a heating installation and Zantingh RKB compact burner for PanAmerican Seed in Hem.
Cryonorm Vaporizer

The test setup for a new gas vaporizer went into operation at Cryonorm, featuring a specially designed RKB 5.0 from Zantingh.
Pre-assembled burner installation U.S.A.

Zantingh designed three burner installations that were completely assembled, tested, and prepared for transport in the workshop.
Bine Agro, Baku, Azerbaijan

At Bine Agro near Baku, six 4 MW burners are operating for 65 hectares of cultivation. The first burners were commissioned in March 2018.
Eneco District Heating Plant

Four Low NOx natural gas burners were supplied for existing boilers at Eneco in Utrecht. NOx emissions decreased by nearly a third.
Statoil refinery Kalundborg, Denmark

At Statoil in Kalundborg, two flue gas condensers were installed to provide extra efficiency for a new steam installation.
Tergooi hospital Hilversum, replacement of burner installation 70 mg

In 2016, Tergooi replaced two burner installations to comply with the emission requirement of 70 mg/m³ at 3% O₂.