Project

Cryonorm Vaporizer

Test setup for gas vaporization

Last week, the test setup for a new gas vaporizer went into operation at Cryonorm in Alphen aan de Rijn. The system vaporizes gases stored in liquid form, which are used in industrial processes.

RKB 5.0 with extended head

The liquid gases pass through the boiler via a piping system. The warm boiler water heats the gases. For this heating process, Zantingh installed a specially designed RKB 5.0 with an extended head.

Cryonorm designed and built the boiler themselves at the F&H Crone factory.

Project details

Completion: 2022
Company details: Cryonorm, Alphen aan de Rijn
Burner type: RKB 5.0 LP MM Gas
Boiler type: Special two-pass boiler based on Cryonorm design; manufactured by F&H Crone

View our
other projects

Borst Tulips

New heating installation with low NOx burner remains well below the 50 mg requirement for Green Label Greenhouse at 34.1 mg/m³.

Unigas Novumax combination in collaboration with HoSt Bioenergy

Electric boilers for Van Gog Kwekerijen

Electric boilers fill buffers during low electricity prices. This ensures energy is used smartly and costs remain manageable in practice.

RKB burner PanAmerican Seed Hem

Ateco worked on a new boiler house with a heating installation and Zantingh RKB compact burner for PanAmerican Seed in Hem.

Pre-assembled burner installation U.S.A.

Zantingh designed three burner installations that were completely assembled, tested, and prepared for transport in the workshop.

Bine Agro, Baku, Azerbaijan

At Bine Agro near Baku, six 4 MW burners are operating for 65 hectares of cultivation. The first burners were commissioned in March 2018.