{"id":3689,"date":"2026-05-21T10:08:38","date_gmt":"2026-05-21T08:08:38","guid":{"rendered":"https:\/\/zantingh.com\/project\/tergooi-hospital-hilversum-replacement-of-burner-installation-70-mg\/"},"modified":"2026-05-21T10:08:38","modified_gmt":"2026-05-21T08:08:38","slug":"tergooi-hospital-hilversum-replacement-of-burner-installation-70-mg","status":"publish","type":"projecten-overzicht","link":"https:\/\/zantingh.com\/en\/project\/tergooi-hospital-hilversum-replacement-of-burner-installation-70-mg\/","title":{"rendered":"Tergooi hospital Hilversum, replacement of burner installation 70 mg"},"excerpt":{"rendered":"<p>In 2016, Tergooi replaced two burner installations to comply with the emission requirement of 70 mg\/m\u00b3 at 3% O\u2082.<\/p>\n","protected":false},"featured_media":3691,"template":"","productcategorie":[],"sector":[78],"class_list":["post-3689","projecten-overzicht","type-projecten-overzicht","status-publish","has-post-thumbnail","hentry","sector-utilities"],"_links":{"self":[{"href":"https:\/\/zantingh.com\/en\/wp-json\/wp\/v2\/projecten-overzicht\/3689","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zantingh.com\/en\/wp-json\/wp\/v2\/projecten-overzicht"}],"about":[{"href":"https:\/\/zantingh.com\/en\/wp-json\/wp\/v2\/types\/projecten-overzicht"}],"version-history":[{"count":0,"href":"https:\/\/zantingh.com\/en\/wp-json\/wp\/v2\/projecten-overzicht\/3689\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zantingh.com\/en\/wp-json\/wp\/v2\/media\/3691"}],"wp:attachment":[{"href":"https:\/\/zantingh.com\/en\/wp-json\/wp\/v2\/media?parent=3689"}],"wp:term":[{"taxonomy":"productcategorie","embeddable":true,"href":"https:\/\/zantingh.com\/en\/wp-json\/wp\/v2\/productcategorie?post=3689"},{"taxonomy":"sector","embeddable":true,"href":"https:\/\/zantingh.com\/en\/wp-json\/wp\/v2\/sector?post=3689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}